This project included the construction of 3 brand new traction power substations serving CTA’s Red, Brown, and Purple lines. Responsible for traction power engineering in certifying the material and equipment installed by Contractor, reviewing product submittals, responding to RFI’s, integrating all equipment installed by the Contractor; factory and field witness testing of all the equipment and systems installed.
Project Details
KEY PERSONNEL
Sunish Mathew, P.E.*
Oren Skidelsky, P.E.*
AGENCY/OWNER
Chicago Transit Authority (CTA)
PROJECT TYPE
System Integrator / System Engineering
PROJECT DURATION
2012 – 2013